Omgili - forum search, search forums  
  

Discussions about apqp process

Displaying 1 - 10 out of 11 discussions.  
RSS Feed Options
Time Frame: (Any time)   Minimum number of replies: (2)   Minimum number of discussing users: (0)
  |  

Page: 1   2  
Keep this page open to be updated with the newest discussions automatically.
Do you have some ideas, check lists or main questions to prepare an internal audit to be compliance versus APQP AIAG Blue Book? Who share something? Thks a lot
Started by on , 5 posts by 3 people.  
Answer Snippets (Read the full thread at elsmar):
It would ....
So "auditing" against the APQP guidelines does not make a whole lot of sense to me.
To be compliance versus APQP AIAG Blue Book? Who share something? Thks a lot The AIAG APQP/CP manual, but not all guidelines may apply.
Can some of you review the attached Process Flow Diagram, FMEA and Control Plan and provide feedback/input. For some reason my customer Supplier Development Engineer will not accept these. His comments were that it does not follow the format or intent...
Started by on , 7 posts by 6 people.  
Answer Snippets (Read the full thread at elsmar):
Your document is an inspection plan, not a process....
How do the documents fail to meet the AIAG format and intent? I see a lot of supplier APQP question the lack of identification of process characteristics in the control plan, however.
Hello all, Long time lurker (member), first time poster! I have a question that pertains to Control Plans. I come from a 13485 background. The company I implemented 13485 with was/is a supplier of a major global medical device manufacturer. In and about...
Started by on , 5 posts by 4 people.  
Answer Snippets (Read the full thread at elsmar):
The current company I am working for has ....
This made.
Basically, create the process flow, then the PFMEA, then the control plan To Function Characteristics (CTFC) as they are affected through the manufacturing process.
As is for TS16949.
Ask your Facebook Friends
本帖最后由 vce 于 2011-11-4 08:04 编辑 Supplier Development Engineer Intern Job Summary: Supplier evaluation, improvement and parts development at suppliers. Key/Primary Responsibilities:  Secure high level suppliers and support supplier selection through SEM...
Started by on , 7 posts  
Answer Snippets (Read the full thread at tongji):
沙发 good +++ +U fighting 大三优先考虑.
OK all, I have some confusion on my end. I am used to having to fill all blank fields in with something (GDP requirements). Well I have recently taken on doing some control plans. and I notice that they have been done various ways for the customers. I...
Started by on , 4 posts by 4 people.  
Answer Snippets (Read the full thread at elsmar):
You can optain it through the AIAG.
It as a process improvement; e.g., "from this point forward..." The Advanced Product Quality Planning and Control Plan - (APQP) Second Edition would be a great tool to use.
Does anyone have the list of requirements Toyota needs for a Part Approval Process? because they obviously do not require the same as the 3 "bigs". I remember the Sample data cover sheet is the PSW, but anyone out there working in/for Toyota could help...
Started by on , 7 posts by 3 people.  
Answer Snippets (Read the full thread at elsmar):
The OP did ask for a list of requirements, so if anyone has APQP/PPAP systems and BMWs requirements....
From Wikipedia, the free encyclopedia ISO 9000 is a family of standards for quality management systems. ISO 9000 is maintained by ISO, the International Organization for Standardization and is administered by accreditation and certification bodies. Some...
Started by on , 12 posts by 3 people.  
Answer Snippets (Read the full thread at egpet):
For each process, determine what kind of procedural documentation is required (note: a “product to determine key points....
A process by measurement, then make sure the process is well enough defined that you can make for improvement.
All, Just thought I would ask the question, who do you think is the best training company for TS16949 Auditing? As I am based in the UK, in my own experience I like Industry Forum. Industry Forum are the training division for the SMMT who are part of ...
Started by on , 8 posts by 7 people.  
Answer Snippets (Read the full thread at elsmar):
I do make a point of when auditor/consultant (me), addressing: * Use of the process approach for the betterment of your to help guide auditors through the process....
Training to both ISO9001 and TS16949, Core tool training and APQP training.
Got a voice mail & email today from Aerotek for a job offer there. Seems like a sweet place. Not lookin' to relocate though. Brian
Started by on , 25 posts by 6 people.  
5 Why’s and root cause....
Someone who can look at a process - document the process and put together a flow diagram / flow plan 5.
FMEA / PFEMA 4.
PPAP 3.
APQP 2.
Fully furnished accommodations during the contract period Top Skills: 1.
Could you please suggest examples related to meet ISO TS clause 7.1.2 Acceptance criteria? Is it related only to the product or also to the bought materials? How to meet zero defects for attribute data? Is it required a procedure? Hope you can help
Started by on , 8 posts by 5 people.  
Answer Snippets (Read the full thread at elsmar):
I think that acceptance criteria should be seen inside the process of product realization that there are some business ....
It should be a part of the contracting phase and APQP, Jim.
Welcome to define acceptance criteria in-process.
Page: 1   2  

Related Message Boards & Forums

  • APQP and PPAP
  • ISO/TS 16949 - International Automotive Quality Systems Standard
  • Common Quality Assurance Processes and Tools
  • 就业与实习 - 第8页 - 同济网论坛
  • FMEA and Control Plans
More Information


Forum Search About Omgili Help Plugins Forum/Board Owners Privacy

i
In Title
In Topic
In Reply
Exclude
Boost