|
How do you figure out whether it's worth parallelizing a particular code block based on its code size? Is the following calculation correct?
Assume:
Thread pool consisting of one thread per CPU. CPU-bound code block with execution time of X milliseconds...
Started by Gili on
, 4 posts
by 4 people.
Answer Snippets (Read the full thread at stackoverflow):
The benefit is really more:
(X * (Y-1)) * Tc * Pf
Where Tc is the cost of the threading framework.
|
|
At the moment I add shipping charge 65Kr.
There are only four prices in the shop.
I need to change the shipping charge to the following way.
Product which cost 198Kr and 268Kr needs 25Kr and more than that price (418 and 498Kr) needs 65Kr.
If a customer...
Started by shin on
, 3 posts
by 3 people.
Answer Snippets (Read the full thread at stackoverflow):
Because the cost of shipping change when shipping one.
I'd take into account the number or items too.
|
|
I've been working on a freelance project for about a year. I build a new feature every month as per client request. Things went smoothly the first several months. I built each new feature as a separate module. But today, there are too many different modules...
Started by John on
, 4 posts
by 4 people.
Answer Snippets (Read the full thread at stackoverflow):
That ideally the code needs refactored to reduce bugs and the time (and cost) of maintaining.
|
Ask your Facebook Friends
|
Interesting and unique underground house. http://www.theblaze.com/stories/want-to-see-the-human-sized-hobbit-house-that-costs-less-than-5000-to-build/
Started by John Raabe on
, 19 posts
by 15 people.
Answer Snippets (Read the full thread at countryplans):
That 4x8 sheet of OSB needs a lot the inspector the NM code and the ICC provisions for straw bale insulation
Yes it would cost a few dollars.
They can be repaired with little overall cost b/c material is on hand.
|
|
I got a few questions on cages.
Averagely whats the cost of building your own cage if you won all the tools?
What size tubing do you use to build a cage?
Would it be cheaper to buy a DIY kit, or just build from scratch?
Just want to get things down before...
Started by JeepinLD on
, 11 posts
by 4 people.
Answer Snippets (Read the full thread at jeepforum):
Different I'm not sure if this picture will post, it cost me roughly $700 for this cage, i built if this picture will post, it cost me roughly $700 for this cage, i built it for a club members LJ about 6 not sure if this picture will post....
|
|
Getting ready to get a new unit and wonder if the larger screen is worth the extra cost. Whats your opinion?
Started by dmov on
, 14 posts
by 12 people.
Answer Snippets (Read the full thread at bbcboards):
The best feature you will like the most in the 8 is the row of soft keys along the bottom and more important differences ... .
No way it can cost that much screen size.
2 inches of screen is double the price.
And 8 is where I have a problem.
|
|
An interesting chart compiled by Slyster on the freak with crash cost comparisons.
Take a look.
50 electric Crash Cost Comparison chart - HeliFreak
I know it's in $ but it still tells us which are expensive etc
Started by Jamin_00 on
, 11 posts
by 7 people.
Answer Snippets (Read the full thread at rcheliaddict):
Great quality compared to say the Fusions but I'm not saying it justifies the cost just is much better size machine, surprised align are not cheaper really as there a pretty much bottom end heli of the day, plus the E6 mention is really....
|
|
Getting ready to get a G2 unit and need to decided if the price difference is worth the larger screen.
thanks
Started by dmov on
, 11 posts
by 7 people.
Answer Snippets (Read the full thread at bbcboards):
I chosen the HDS8 mainly because....
But on the other hand I feel like the screen size of the HDS8 is a perfect for most everyone.
But as for me I did decide the bigger screen is better for me, and I didn't mind paying the cost difference.
|
|
Hi!
The Raspberry Pi Foundation has created the cheapest computer of the world (about 25 US dollars):
http://www.raspberrypi.org/
It uses Ubuntu Linux
I think it is a promising project but I don't think any JVM is installed by default. Do you think OpenJDK...
Started by gouessej on
, 22 posts
by 13 people.
Answer Snippets (Read the full thread at java-gaming):
This: http://landofthebanned.wordpress.com/2011/03/05/bobs-game-the-nd/
That is pretty low cost://landofthebanned.wordpress.com/2011/03/05/bobs-game-the-nd/
That is pretty low cost will it run J2ME out.
|
|
Hi Experts
I have maintained my BOM Base Quantity and operation Base quantity in Master recipe as 400 Lts to a semi finished material
1. What will be the Costing lot size to be maintained in the material master Costing 1 View ?. Is this should be equal...
Started by Palaniappan.pms on
, 7 posts
by 3 people.
Answer Snippets (Read the full thread at sap):
I am I Correct
Also
Thanks and Regards
Palaniappan Hi....
Costing lot size to maintain 400 as the costing lot size, as same as my BOM Base Quantity.
Price unit in accounting view is normally the same as the base unit of measure .
|